[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Animism revisted
- Subject: Animism revisted
- From: tim at unrealexpectations.ath.cx (stetson)
- Date: Sat May 29 00:52:50 2004
K then......
Cincy's coming, I have a zillion and three things that I have to do on the
Lexicar so it will be 8hr roadtrip worthy, and I get a new project.
Well......the past par Golf is running, drove it today (it still needs
MAJOR tuning, but it will do).
So......since I've neglected the Lexicar for such a period I decided that
today before I took it to pick up my daughter, I would treat it to the new
wheels and get at least a little prep done for Cincy.
They (the wheels) look pretty tight so once again I'm a happy clam
whistling down the road.
I pick up my daughter @ her last day of school and on the way home the
Lexicar conveys it's displeasure w/ it's neglect by refusing to stay
running under 2K RPM, which makes for a spirited and exciting drive home
especially w/ traffic lights and not having a 3rd foot.
These are the exact symptoms of what just happened w/ the Golf.
Now you all probably have surmised that this is yet again another instance
of sibling rivalry (or more like 2nd cousins).
But as a result I believe that the Lexicar will be sporting all new vacuum
rubber @ Cincy.
Never had a vacuum problem before now...........Hmmmmmmmm.....
All things considered, if I want to make my mods in time I will be hard
pressed not to be in the garage 24/7 (well 6 now) doing:
1.) LSD install on the 4K and drain and refill w/ MTL.
2.) .80 5th replacement on the 4K
(I know these were supposed to happen to the 9A but time pressure crept up
on me and I just don't have the time. Besides, I wanted to do this to the
4K too, right?)
3.) Cam installation and valve adjustment
4.) G60 valve cover
5.) Balance Group coilover kit w/ yet to be determined shock and struts
and new strut bearings
6.) Ancillary cosmetic tweaks
I'm figuring 1 day for tranny work, 1 day for valve work, 1 1/2 days for
coilovers, and 2 days for the rest.
Pretty unrealistic, eh?
Plotting and planning to get at least 1/2 this done in time,
Tim
HOW TO PROVE IT, PART 5
proof by accumulated evidence:
Long and diligent search has not revealed a counterexample.
proof by cosmology:
The negation of the proposition is unimaginable or
meaningless. Popular for proofs of the existence of God.
proof by mutual reference:
In reference A, Theorem 5 is said to follow from Theorem 3 in
reference B, which is shown to follow from Corollary 6.2 in
reference C, which is an easy consequence of Theorem 5 in
reference A.
proof by metaproof:
A method is given to construct the desired proof. The
correctness of the method is proved by any of these
techniques.